đ Free Worldwide Shipping on All Orders!Shop Now













Lifetime Impact 44
PRODUCT DESCRIPTION:
- Item Code: LIT-1268
Product details:
The Lifetime Impact Youth Basketball Set is a 44-inch board set with blow-molded high density polyethylene frame with frame pad.
- It also has an orange classic rim with a 50-gram all-weather net.
- Telescoping height adjustment: 7.5-10ft
- It also includes a Streamline Rim with an all-weather nylon net and a 2.75 in. diameter round steel pole.
- With a streamline 12-gallon portable base, this system is the perfect beginner residential basketball system.
$59.86
Original: $171.02
-65%Lifetime Impact 44â
$171.02
$59.86Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
PRODUCT DESCRIPTION:
- Item Code: LIT-1268
Product details:
The Lifetime Impact Youth Basketball Set is a 44-inch board set with blow-molded high density polyethylene frame with frame pad.
- It also has an orange classic rim with a 50-gram all-weather net.
- Telescoping height adjustment: 7.5-10ft
- It also includes a Streamline Rim with an all-weather nylon net and a 2.75 in. diameter round steel pole.
- With a streamline 12-gallon portable base, this system is the perfect beginner residential basketball system.














